Attached to this post is a letter from the Glendale Public Works Dept. regarding future plans for resurfacing and rehabilitating Glenoaks Blvd.
In short, Glenoaks Blvd. from Verdugo Rd., to the entrance to the baseball fields will receive a couple of different types of rehabilitation. Parts of the road will receive slurry sealing while other sections will get rubberized asphalt concrete overlay with selective pavement removal and replacement. These repairs will start sometime in the summer of 2012 and will be completed by the end of the year. Reported potholes in the canyon will be repaired sometime in the near future.
The letter from the City Engineer can be read here: